X

PRODUCTS

Electric hoists represent their own machinery, strength, and toughness, while the stage is elegant, flowing, and soft, with conflicts and collisions between the two.

High efficiency Electric Hoist Crane 0.5 ton

Time:2023-12-18

Brief Explanation :

A small stage can only be built with a stage extension frame, but a large stage has a complex structure and involves numerous mechanical equipment such as stage lighting and sound equipment.

Category : Stage Chain Hoist Series

Get a Quote

Product Details

What should I do if there is a deviation when using a stage chain hoist to lift the crossbar?

A small stage can only be built with a stage extension frame, but a large stage has a complex structure and involves numerous mechanical equipment such as stage lighting and sound equipment. It is not easy to quickly, efficiently, and safely build a stage and complete a performance. Nowadays, with the addition of stage chain hoists, building a stage has become easier, but this needs to be based on correct operation.

Firstly, suitable lifting points must be selected. Only sturdy and stable lifting points can ensure the safety of the hoist, heavy objects, and surrounding operators; Secondly, the stage crossbeam can withstand significant impact forces; Thirdly, do a good job in daily maintenance and upkeep.

What should I do if there is a deviation when lifting the frame? The correct approach is to stop returning and find the cause before continuing with the installation.

Firstly, we can start with the lifting tool: the chain hoist. If the chain length, spacing, and suspension points of two chain hoists are not the same, it can also lead to deviation in the lifting position;

Secondly, we can start with operators. If two operators simultaneously pull the zipper strip of the gourd and apply the same amount of force at the same frequency, it can avoid the occurrence of deviation. Conversely, it can lead to deviation.

RELATED PRODUCTS .

RELATED NEWS .